From msom-skills
Plans an M&SOM revision around DE/AE priorities and drafts a point-by-point response letter preserving operations centrality and the 32-page cap.
How this skill is triggered — by the user, by Claude, or both
Slash command
/msom-skills:msom-rebuttalThe summary Claude sees in its skill listing — used to decide when to auto-load this skill
- You received an M&SOM major/minor revision and must plan the response
Plan from the Department Editor and Associate Editor signals first — in M&SOM's department-routed model, their priorities are the binding contract; referee points must each be addressed or carefully rebutted. Do the actual modeling/analysis work before writing prose: add the proposition, run the requested numerical study, strengthen the identification. Then write a response that maps each comment to a concrete change.
The added results must fit the 32-page typeset cap (everything counts) — push new proofs and experiments into the online supplement (≤ 16 pages). Keep the manuscript anonymized (double-anonymous), keep INFORMS author-year style, and update the structured abstract if results changed.
In M&SOM's department-routed model the comments are not equal in weight. The DE's and AE's items are binding — they gate acceptance — so address them fully and rebut only with strong evidence; substantive referee points are mapped to comment → change → exact location, and conflicts go to the AE rather than being silently resolved. The fatal error is spending the revision on referee minutiae while under-serving the DE/AE priority.
Vignette: an R&R on a supply-chain contracting model where the AE writes "the coordination result is elegant but I do not see the managerial insight" and a referee asks for a more general demand distribution. The disciplined response treats the AE's insight gap as the binding item — adding the comparative static that the optimal buyback rate falls as demand becomes more variable and leading with that rule — then does the referee's generalization, showing the structure survives under an illustrative broader class, and pushes the extended proof to the supplement. The letter maps each point to a section and proposition number.
【DE/AE priorities】binding items ...
【Per-referee plan】comment → change / rebuttal → location ...
【Work done】proofs / numerical study / identification ...
【Constraints】within 32 pages; overflow to supplement; abstract updated ...
【Response letter】point-by-point with exact locations ...
【Next step】resubmit via ScholarOne → msom-review-process
npx claudepluginhub brycewang-stanford/awesome-journal-skills --plugin msom-skillsDrafts a point-by-point response and revision plan for a Management Science R&R, prioritizing the Department Editor's binding concerns and preserving double-anonymization.
Drafts a point-by-point response letter after a Production and Operations Management (POM) revise-and-resubmit, addressing the Department Editor and referees, splitting changes between the main paper and e-companion, and respecting the 32-page cap.
Plans and drafts a point-by-point revision response letter for JOM R&R, prioritizing DE/AE concerns and resolving method-check issues.