Help us improve
Share bugs, ideas, or general feedback.
From engineering
Generates customizable pre-deployment checklists to verify CI status, tests, reviews, migrations, feature flags, rollback plans, and monitor production deploys.
npx claudepluginhub anthropics/knowledge-work-plugins --plugin engineeringHow this skill is triggered — by the user, by Claude, or both
Slash command
/engineering:deploy-checklistThe summary Claude sees in its skill listing — used to decide when to auto-load this skill
> If you see unfamiliar placeholders or need to check which tools are connected, see [CONNECTORS.md](../../CONNECTORS.md).
Generates pre-deployment verification checklists customized to the project's tech stack, including rollback triggers and graph-based module boundary validation.
Generates pre-deployment checklists for code quality, security, performance, infrastructure, database migrations, and produces go/no-go readiness report.
Audits release readiness by classifying risk level, checking verification evidence, and confirming operational readiness before deploying or merging.
Share bugs, ideas, or general feedback.
If you see unfamiliar placeholders or need to check which tools are connected, see CONNECTORS.md.
Generate a pre-deployment checklist to verify readiness before shipping.
/deploy-checklist $ARGUMENTS
## Deploy Checklist: [Service/Release]
**Date:** [Date] | **Deployer:** [Name]
### Pre-Deploy
- [ ] All tests passing in CI
- [ ] Code reviewed and approved
- [ ] No known critical bugs in release
- [ ] Database migrations tested (if applicable)
- [ ] Feature flags configured (if applicable)
- [ ] Rollback plan documented
- [ ] On-call team notified
### Deploy
- [ ] Deploy to staging and verify
- [ ] Run smoke tests
- [ ] Deploy to production (canary if available)
- [ ] Monitor error rates and latency for 15 min
- [ ] Verify key user flows
### Post-Deploy
- [ ] Confirm metrics are nominal
- [ ] Update release notes / changelog
- [ ] Notify stakeholders
- [ ] Close related tickets
### Rollback Triggers
- Error rate exceeds [X]%
- P50 latency exceeds [X]ms
- [Critical user flow] fails
Tell me about your deploy and I'll customize the checklist:
If ~~source control is connected:
If ~~CI/CD is connected:
If ~~monitoring is connected: