Risk registers, environmental compliance, project closeout, commissioning, subcontractor scorecards, conflict detection, and data health monitoring.
npx claudepluginhub mgoodman60/foreman-os-plugin --plugin foremanos-complianceTrack project closeout, commissioning, and warranty items
Cross-discipline conflict detection and resolution tracking
Data health sweep — detect issues, apply normalization fixes, generate confidence report
Environmental compliance and LEED tracking
Risk register and mitigation tracking
Subcontractor performance scorecards
Skill for tracking project closeout and building commissioning activities. Manages closeout checklists, commissioning workflows, warranty tracking, and substantial/final completion documentation. Integrates with punch-list and inspection systems.
Generate Construction Operations Building Information Exchange (COBie) compliant spreadsheets from existing project intelligence data. Maps extracted data into the 18 standard COBie worksheet format for facility management handover. Critical for healthcare facilities where ongoing maintenance and asset management are regulatory requirements. Exports as multi-tab Excel workbook. Triggers: "COBie", "COBie export", "facility handover", "asset register", "O&M data", "building information exchange", "commissioning data", "facility management data", "asset data", "COBie spreadsheet", "handover data", "building handover".
<!-- STUB: Canonical source is foremanos-cost/skills/delay-tracker/SKILL.md. Run sync-stubs.sh to update. Do NOT edit directly. -->
<!-- STUB: Canonical source is foremanos-intel/skills/document-intelligence/SKILL.md. Run sync-stubs.sh to update. Do NOT edit directly. -->
Environmental compliance management for construction projects. Covers LEED v4.1 construction administration, SWPPP permit compliance and inspections, hazardous materials management (asbestos, lead, mold, contaminated soil), construction waste management and diversion tracking, dust and air quality control, noise ordinance compliance, silica exposure prevention, and environmental incident response. Beyond basic BMP installation (see field-reference/bmp-field-guide.md). Triggers: "environmental", "LEED", "SWPPP", "hazmat", "hazardous materials", "asbestos", "lead paint", "waste management", "dust control", "noise", "environmental compliance", "recycling", "diversion", "VOC", "silica", "EPD", "HPD", "spill", "contaminated soil", "mold", "air quality", "noise variance", "waste diversion", "C&D waste".
<!-- STUB: Canonical source is foremanos-core/skills/project-data/SKILL.md. Run sync-stubs.sh to update. Do NOT edit directly. -->
Proactive risk identification, assessment, and mitigation management for construction projects. Maintain a living risk register, run 5x5 probability-impact assessments, allocate and track contingency drawdown, manage weather and force majeure contingencies, and generate risk reports with heat maps. Integrates with delay-tracker, last-planner, cost-tracking, safety-management, morning-brief, and change-order-tracker. Triggers: "risk", "risk register", "risk matrix", "risk assessment", "contingency", "mitigation", "force majeure", "weather risk", "risk review", "risk report".
Objective, data-driven subcontractor performance scorecards based on five weighted dimensions: Schedule Adherence (25%), Quality (25%), Safety (20%), Responsiveness (15%), and Professionalism (15%). Aggregates data from daily reports, inspections, PPC tracking, safety records, and RFI/submittal turnaround. Enables informed bidding decisions, back-charge documentation, and performance improvement conversations. Triggers: "sub scorecard", "subcontractor performance", "rate sub", "sub evaluation", "vendor performance", "trade performance", "sub rating", "contractor scorecard", "performance review", "back charge", "sub report card".
Comprehensive skill pack with 66 specialized skills for full-stack developers: 12 language experts (Python, TypeScript, Go, Rust, C++, Swift, Kotlin, C#, PHP, Java, SQL, JavaScript), 10 backend frameworks, 6 frontend/mobile, plus infrastructure, DevOps, security, and testing. Features progressive disclosure architecture for 50% faster loading.
Manus-style persistent markdown files for planning, progress tracking, and knowledge storage. Works with Claude Code, Kiro, Clawd CLI, Gemini CLI, Cursor, Continue, and 11+ AI coding assistants.
Complete creative writing suite with 10 specialized agents covering the full writing process: research gathering, character development, story architecture, world-building, dialogue coaching, editing/review, outlining, content strategy, believability auditing, and prose style/voice analysis. Includes genre-specific guides, templates, and quality checklists.
Efficient skill management system with progressive discovery — 410+ production-ready skills across 33+ domains
ETL pipeline construction, data warehouse design, batch processing workflows, and data-driven feature development
Interactive translator that converts plain English descriptions into structured JSON schemas for Nano Banana Pro (Gemini 3 Pro Image). Supports marketing images, UI mockups, diagrams, data visualizations, and social graphics.