Guides Odoo Manufacturing configuration: Bills of Materials, Work Centers, routings, MRP planning, and production order workflows.
From antigravity-awesome-skillsnpx claudepluginhub sickn33/antigravity-awesome-skills --plugin antigravity-awesome-skillsThis skill uses the workspace's default tool permissions.
Designs and optimizes AI agent action spaces, tool definitions, observation formats, error recovery, and context for higher task completion rates.
Enables AI agents to execute x402 payments with per-task budgets, spending controls, and non-custodial wallets via MCP tools. Use when agents pay for APIs, services, or other agents.
Compares coding agents like Claude Code and Aider on custom YAML-defined codebase tasks using git worktrees, measuring pass rate, cost, time, and consistency.
This skill helps you configure and optimize Odoo Manufacturing (MRP). It covers Bills of Materials (BoM), Work Centers, routing operations, production order lifecycle, and Material Requirements Planning (MRP) runs to ensure you never run short of materials.
@odoo-manufacturing-advisor and describe your manufacturing scenario.Menu: Manufacturing → Products → Bills of Materials → New
Product: Finished Widget v2
BoM Type: Manufacture This Product
Quantity: 1 (produce 1 unit per BoM)
Components Tab:
- Raw Plastic Sheet | Qty: 0.5 | Unit: kg
- Steel Bolt M6 | Qty: 4 | Unit: Units
- Rubber Gasket | Qty: 1 | Unit: Units
Operations Tab (requires "Work Orders" enabled in MFG Settings):
- Operation: Injection Molding | Work Center: Press A | Duration: 30 min
- Operation: Assembly | Work Center: Line 1 | Duration: 15 min
BoM Types explained:
- Manufacture This Product — standard production BoM, creates a Manufacturing Order
- Kit — sold as a bundle; components are delivered separately (no MO created)
- Subcontracting — components are sent to a subcontractor who returns the finished product
Menu: Manufacturing → Configuration → Work Centers → New
Work Center: CNC Machine 1
Working Hours: Standard 40h/week
Time Efficiency: 85% (machine downtime factored in; 85% = 34 effective hrs/week)
Capacity: 2 (can run 2 production operations simultaneously)
OEE Target: 90% (Overall Equipment Effectiveness KPI target)
Costs per Hour: $75.00 (used for manufacturing cost reporting)
The MRP scheduler runs automatically via a daily cron job.
To trigger it manually:
Menu: Inventory → Operations → Replenishment → Run Scheduler
(or Manufacturing → Planning → Replenishment in some versions)
After running, review procurement exceptions:
Menu: Inventory → Operations → Replenishment
Message Types:
"Replenish" — Stock is below minimum; needs a PO or MO
"Reschedule" — An order's scheduled date conflicts with demand
"Cancel" — Demand no longer exists; the order can be cancelled