WBS, scheduling, resource planning, risk management, and communication planning for software and general PMs Use when user asks to "create a WBS", "build a project schedule", "risk register", or mentions work breakdown structure, resource planning, RACI, or critical path.
npx claudepluginhub lauraflorentin/skills-marketplace --plugin project-managementThis skill uses the workspace's default tool permissions.
> **Important**: This plugin assists with project management workflows but does not replace professional judgment. All outputs should be validated with stakeholders and your team before making project decisions.
Compares coding agents like Claude Code and Aider on custom YAML-defined codebase tasks using git worktrees, measuring pass rate, cost, time, and consistency.
Designs and optimizes AI agent action spaces, tool definitions, observation formats, error recovery, and context for higher task completion rates.
Designs, implements, and audits WCAG 2.2 AA accessible UIs for Web (ARIA/HTML5), iOS (SwiftUI traits), and Android (Compose semantics). Audits code for compliance gaps.
Important: This plugin assists with project management workflows but does not replace professional judgment. All outputs should be validated with stakeholders and your team before making project decisions.
Planning is the bridge between a charter and execution. A charter tells you why the project exists and what success looks like. Planning tells you how to get there -- what work needs to happen, in what order, with which people, against which risks, and communicated to whom. Skip planning and you get heroics, rework, and surprises. Over-plan and you get analysis paralysis, stale documents, and a team that confuses motion with progress.
This skill covers five planning disciplines: Work Breakdown Structure, Scheduling, Resource Planning, Risk Management, and Communication Planning. Each section provides both a software mode (Agile/Scrum-oriented, sprint-based, story-level) and a general mode (traditional/predictive, phase-based, activity-level). Use whichever fits your project context, or blend them for hybrid approaches.
A Work Breakdown Structure (WBS) is a hierarchical decomposition of the total scope of work the project team must execute. It is the foundation for scheduling, cost estimation, resource planning, and risk identification. If your WBS is wrong, everything downstream is wrong.
Three rules govern every well-formed WBS:
The 100% Rule. The WBS must capture 100% of the work defined by the project scope, including project management work itself. Every level of decomposition must collectively account for all the work of the parent element. Nothing is left out. Nothing is double-counted.
Mutually Exclusive Elements. No work package should overlap with another. If two work packages share the same task, you have a decomposition error. Ambiguous ownership leads to duplicated effort or gaps.
Deliverable-Oriented Decomposition. Each element in the WBS should describe a deliverable or outcome, not an action. "User authentication module" is a deliverable. "Write code" is an action. Actions belong in schedules; deliverables belong in the WBS.
Software projects decompose scope through a four-level hierarchy:
Level 1: Epic (large body of work, typically a quarter-level initiative)
Level 2: Feature (a user-facing capability within the epic)
Level 3: Story (a single unit of user value, completable in one sprint)
Level 4: Task (a technical step needed to implement the story)
Story Point Estimation. Stories are estimated in story points using a Fibonacci-like scale (1, 2, 3, 5, 8, 13). Points measure relative complexity, not hours. A 5-point story is roughly 2.5 times the effort of a 2-point story, but the team calibrates this through experience. Any story estimated at 13 or above should be split -- it is too large for a single sprint and too uncertain to estimate accurately.
Acceptance Criteria Per Story. Every story must have acceptance criteria before it enters a sprint. Acceptance criteria define the conditions under which the story is considered done. They are written in Given/When/Then format or as a simple checklist. Without acceptance criteria, "done" is a matter of opinion.
Definition of Ready. A story is ready for sprint planning when it meets all of these conditions:
Worked Example -- Software Mode:
EPIC: User Authentication System
|
+-- FEATURE 1: Email/Password Login
| +-- STORY 1.1: User can register with email and password (5 pts)
| | Acceptance criteria:
| | - Given a new user, when they submit a valid email and password,
| | then an account is created and a verification email is sent
| | - Given an existing email, when a user tries to register,
| | then they see an error "Account already exists"
| | Tasks:
| | - Create registration API endpoint
| | - Build registration form component
| | - Implement email verification service
| | - Write unit and integration tests
| |
| +-- STORY 1.2: User can log in with email and password (3 pts)
| | Acceptance criteria:
| | - Given valid credentials, when user submits login form,
| | then they receive a JWT and are redirected to dashboard
| | - Given invalid credentials, when user submits login form,
| | then they see a generic error (no credential enumeration)
| | Tasks:
| | - Create login API endpoint
| | - Build login form component
| | - Implement JWT token generation and validation
| | - Write unit and integration tests
| |
| +-- STORY 1.3: User can reset their password (5 pts)
|
+-- FEATURE 2: OAuth Social Login
| +-- STORY 2.1: User can log in with Google (3 pts)
| +-- STORY 2.2: User can log in with GitHub (3 pts)
| +-- STORY 2.3: User can link/unlink social accounts (5 pts)
|
+-- FEATURE 3: Multi-Factor Authentication
+-- STORY 3.1: User can enable TOTP-based MFA (8 pts)
+-- STORY 3.2: User can use backup codes (5 pts)
+-- STORY 3.3: Admin can enforce MFA for the organization (5 pts)
Non-software projects (construction, events, organizational change, marketing campaigns) decompose scope through a four-level hierarchy:
Level 1: Phase (a major stage of the project lifecycle)
Level 2: Deliverable (a tangible output produced in that phase)
Level 3: Work Package (a grouping of related activities that produce part of the deliverable)
Level 4: Activity (a single task with an estimated duration and resource assignment)
Hours-Based Estimation. Activities are estimated in hours or days. Use three-point estimation (optimistic, most likely, pessimistic) for activities with high uncertainty. For routine activities, use analogous estimation based on past projects.
Worked Example -- General Mode:
PHASE 1: Office Relocation -- Planning
|
+-- DELIVERABLE 1.1: Site Selection Report
| +-- WP 1.1.1: Requirements Gathering
| | - Activity: Interview department heads (16 hrs)
| | - Activity: Document space requirements per team (8 hrs)
| | - Activity: Define infrastructure requirements (8 hrs)
| +-- WP 1.1.2: Site Evaluation
| | - Activity: Tour candidate sites (24 hrs)
| | - Activity: Score sites against criteria matrix (8 hrs)
| | - Activity: Negotiate preliminary lease terms (16 hrs)
| +-- WP 1.1.3: Final Report
| - Activity: Compile evaluation report (8 hrs)
| - Activity: Present to steering committee (4 hrs)
|
+-- DELIVERABLE 1.2: Budget Approval Package
+-- WP 1.2.1: Cost Estimation
| - Activity: Get contractor bids for build-out (40 hrs)
| - Activity: Estimate moving costs (8 hrs)
| - Activity: Calculate technology upgrade costs (16 hrs)
+-- WP 1.2.2: Budget Presentation
- Activity: Build budget model with contingency (8 hrs)
- Activity: Present to finance committee (4 hrs)
Every work package in the WBS should have a corresponding dictionary entry. The dictionary provides the detail that the hierarchical chart cannot.
WBS DICTIONARY ENTRY
=====================
WBS ID: _______________
Name: _______________
Description: _______________________________________________
_______________________________________________
Parent element: _______________
Owner: _______________
Effort estimate: ___________ (hours or story points)
Duration estimate: ___________ (calendar days)
Dependencies: _______________________________________________
Predecessors: _______________________________________________
Successors: _______________________________________________
Acceptance criteria: _______________________________________________
_______________________________________________
Assumptions: _______________________________________________
Constraints: _______________________________________________
Risks: _______________________________________________
Cost estimate: _______________
Notes: _______________________________________________
| Guideline | Software Mode | General Mode |
|---|---|---|
| Stop decomposing when... | A story fits in one sprint | An activity is 8-80 hours |
| Too granular if... | You are writing tasks for tasks | An activity is under 4 hours |
| Too coarse if... | A story cannot be estimated with confidence | An activity spans more than 2 weeks |
| Number of children per parent | 3-7 is ideal | 3-9 is ideal |
| Who decomposes | The team that will do the work | The team that will do the work |
The 8-80 rule for general mode means no activity should be estimated at fewer than 8 hours (too granular to manage) or more than 80 hours (too coarse to track meaningfully). For software mode, the equivalent is the one-sprint rule: if a story cannot be completed in a single sprint, it needs to be split.
Scheduling transforms the WBS into a time-sequenced plan. It answers: what happens when, in what order, and how long will the project take?
The sprint length determines your feedback cadence. Shorter sprints mean faster feedback but higher ceremony overhead. Longer sprints give more focus time but delay course corrections.
| Sprint Length | Best For | Trade-offs |
|---|---|---|
| 1 week | High-uncertainty projects, brand-new teams, rapidly changing requirements, prototyping phases | Very fast feedback. High ceremony overhead (planning, review, retro every week). Stories must be very small. Limited time for deep work. |
| 2 weeks | Most software teams. Default recommendation when unsure. | Good balance of feedback speed and focus time. Enough room for 3-8 point stories. Industry standard. |
| 3 weeks | Teams with heavy external dependencies, hardware/software integration, teams spanning multiple time zones | More room for integration work. Retros feel less frequent, which can slow improvement. Uncommon -- can feel like an awkward middle ground. |
| 4 weeks | Regulated environments, teams with long QA cycles, projects with heavy documentation requirements | Maximum focus time. Delayed feedback increases risk of building the wrong thing. Feels close to mini-waterfall if the team is not disciplined. |
Recommendation: Start with 2-week sprints. Adjust only after 4-6 sprints when you have data on what works for your team.
New teams have no historical velocity. Do not guess. Instead:
| Method | When to Use | Accuracy |
|---|---|---|
| Sprint 0 spike | Before first real sprint | Low-Medium |
| Heuristic (devs x 5-8 pts) | Day one, no data | Low |
| 3-sprint average | After sprint 3 | Medium |
| 6-sprint average | After sprint 6 | Medium-High |
Every sprint needs a goal -- a single sentence describing what the team commits to achieving. The sprint goal is not a list of stories. It is the outcome those stories collectively produce.
Good sprint goals:
Bad sprint goals:
Sprint planning is the ceremony where the team commits to a sprint goal and selects stories from the backlog. A poorly run sprint planning meeting wastes hours and produces vague commitments. A well-run one takes 1-2 hours (for a 2-week sprint) and leaves the team with clear work and a shared understanding of the goal.
SPRINT PLANNING AGENDA
=======================
Sprint: ___ Date: YYYY-MM-DD Duration: 2 hours max
PART 1: WHAT (45 min)
1. Product owner presents the proposed sprint goal (10 min)
2. Product owner walks through top-priority backlog items (20 min)
- For each item: context, acceptance criteria, open questions
3. Team asks clarifying questions (15 min)
- If a story cannot be understood, it goes back to refinement
PART 2: HOW (60 min)
4. Team selects stories that fit the sprint goal and capacity (15 min)
- Use yesterday's weather (average velocity) as the guide
- Do not exceed capacity — leave 10-15% buffer
5. Team breaks stories into tasks (optional for mature teams) (30 min)
- Identify technical approach for each story
- Flag stories that need spikes or have unknowns
6. Team confirms sprint goal and commitment (10 min)
- Read the sprint goal aloud
- Each team member verbally confirms they understand and commit
PART 3: WRAP-UP (15 min)
7. Identify risks or dependencies for this sprint (10 min)
8. Update the sprint board (5 min)
OUTPUT:
- Sprint goal (one sentence)
- Selected stories with point total
- Identified risks and dependencies
- Sprint board updated and visible to all
Release planning maps sprints to releases. A release is a deployable increment that you choose to ship to users.
RELEASE PLAN
=============
Product: _______________
Release cadence: _______________
Velocity assumption: ___________ pts/sprint
Release 1.0 — Target: Sprint 4 (YYYY-MM-DD)
Sprint 1: [sprint goal] — [total pts planned]
Sprint 2: [sprint goal] — [total pts planned]
Sprint 3: [sprint goal] — [total pts planned]
Sprint 4: [sprint goal + stabilization] — [total pts planned]
Total scope: ___ pts | Buffer: ___ pts (10-20% of total)
Release 1.1 — Target: Sprint 8 (YYYY-MM-DD)
Sprint 5: [sprint goal] — [total pts planned]
Sprint 6: [sprint goal] — [total pts planned]
Sprint 7: [sprint goal] — [total pts planned]
Sprint 8: [sprint goal + stabilization] — [total pts planned]
Total scope: ___ pts | Buffer: ___ pts
Key rule: Never plan a release at 100% of theoretical capacity. Reserve 10-20% for bugs, technical debt, and scope changes discovered mid-release.
Story mapping arranges stories in two dimensions: left-to-right by user workflow sequence, top-to-bottom by priority. The top row forms the "walking skeleton" -- the minimum set of stories that delivers an end-to-end user flow.
USER WORKFLOW (left to right):
Sign Up → Browse → Search → Add to Cart → Checkout → Confirm
PRIORITY (top to bottom):
Row 1 (MVP): Basic List Keyword Add item Credit Email
reg. view search to cart card receipt
Row 2 (Release 2): OAuth Filter Advanced Save for PayPal Order
login by cat. filters later tracking
Row 3 (Release 3): SSO Recs AI search Wishlist Apple Pay Returns
Use story mapping to define release boundaries. Draw a horizontal line across the map -- everything above the line is in the release, everything below is deferred.
Story mapping workshop process:
Story mapping is particularly useful when a project has many stories and the team is struggling to decide what to build first. It forces a conversation about user value rather than technical convenience.
The Critical Path Method (CPM) calculates the earliest and latest start/finish times for every activity. The difference between latest and earliest is the float (also called slack). Activities with zero float are on the critical path -- any delay to these activities delays the entire project.
Forward Pass (calculates Early Start and Early Finish):
Backward Pass (calculates Late Finish and Late Start):
Float Calculation:
Worked Example:
Activity Duration Predecessors ES EF LS LF Float Critical?
-------- -------- ------------ --- --- --- --- ----- ---------
A 3 -- 0 3 0 3 0 YES
B 5 A 3 8 4 9 1 no
C 6 A 3 9 3 9 0 YES
D 2 B 8 10 9 11 1 no
E 4 C 9 13 9 13 0 YES
F 3 D, E 13 16 13 16 0 YES
Project duration: 16 days
Critical path: A → C → E → F
In this example, activities B and D have 1 day of float each. They can slip by 1 day without delaying the project. Activities A, C, E, and F have zero float -- any delay to these activities pushes out the project end date.
When activity durations are uncertain, use PERT (Program Evaluation and Review Technique) three-point estimation:
Formula:
Expected Duration = (Optimistic + 4 * Most Likely + Pessimistic) / 6
Standard Deviation = (Pessimistic - Optimistic) / 6
Worked Example:
| Activity | Optimistic (O) | Most Likely (M) | Pessimistic (P) | Expected | Std Dev |
|---|---|---|---|---|---|
| Requirements gathering | 5 days | 8 days | 17 days | 9.0 days | 2.0 |
| Design | 10 days | 15 days | 26 days | 16.0 days | 2.67 |
| Development | 20 days | 30 days | 46 days | 31.0 days | 4.33 |
| Testing | 8 days | 12 days | 22 days | 13.0 days | 2.33 |
To calculate the probability of completing the project by a target date, sum the expected durations for the critical path and use the combined standard deviation (square root of the sum of variances).
A Gantt chart is a bar chart that maps activities against time. It is the most common way to communicate a project schedule.
GANTT CHART — [Project Name]
Start: YYYY-MM-DD | End: YYYY-MM-DD
Activity Owner Week1 Week2 Week3 Week4 Week5 Week6
-------------------- ---------- ----- ----- ----- ----- ----- -----
Requirements PM ===== ==
Design UX Lead ==== =====
Development (Phase 1) Dev Lead === ===== ==
Development (Phase 2) Dev Lead ==== ==
Testing QA Lead == ===== ===
Deployment DevOps ===
Documentation Tech Writer === === === ==
LEGEND: ===== Active work period ---- Float/buffer * Milestone
Milestones are zero-duration events that mark significant points in the schedule. They are decision points, phase transitions, or external commitments.
Good milestones:
Bad milestones:
Phase gates are formal checkpoints where the project must meet defined criteria before proceeding. They prevent throwing resources at a project that should be killed, pivoted, or paused.
| Gate | Name | Key Criteria |
|---|---|---|
| G0 | Concept | Business case approved, rough order-of-magnitude estimate within budget tolerance, sponsor identified |
| G1 | Planning Complete | WBS complete and baselined, schedule approved, resources committed, risks assessed, communication plan in place |
| G2 | Design Complete | Design reviewed and approved, technical architecture validated, key risks mitigated or accepted |
| G3 | Build Complete | All deliverables produced, unit testing passed, integration testing passed, defect count within threshold |
| G4 | Acceptance | UAT passed, training completed, operational readiness confirmed, deployment plan approved |
| G5 | Close | Lessons learned captured, resources released, final financials reconciled, sponsor sign-off received |
Dependencies define the sequencing logic between activities. There are four types:
| Type | Name | Meaning | Example |
|---|---|---|---|
| FS | Finish-to-Start | B cannot start until A finishes | Testing cannot start until development finishes |
| SS | Start-to-Start | B cannot start until A starts | Documentation can start when development starts (but not before) |
| FF | Finish-to-Finish | B cannot finish until A finishes | Testing cannot finish until all defect fixes finish |
| SF | Start-to-Finish | B cannot finish until A starts | The night shift cannot finish until the day shift starts (rare, usually scheduling/coverage) |
FS is the default and most common. SS and FF are useful for overlapping activities. SF is rare -- if you think you need it, double-check your logic.
Leads and Lags:
When the calculated end date is later than the required deadline, you have two options:
| Technique | How It Works | Trade-offs |
|---|---|---|
| Crashing | Add resources to critical path activities to shorten their duration | Increases cost. Only works if the activity is resource-constrained (not all are). Adding people to a late project often makes it later (Brooks's Law). Diminishing returns -- doubling the team does not halve the duration. |
| Fast-tracking | Overlap activities that were planned sequentially | Increases risk. Activities done in parallel may need rework if the predecessor output changes. Only works for activities that have a discretionary (soft) dependency, not a mandatory (hard) dependency. |
Decision framework:
Buffers protect the schedule from uncertainty without inflating individual activity estimates.
Project Buffer. Placed at the end of the critical path. Sized at 25-50% of the critical path duration. Consumed as critical path activities run late. Monitor the rate of consumption -- if you are burning buffer faster than completing work, the project is trending late.
Feeding Buffers. Placed where non-critical paths feed into the critical path. Sized at 25-50% of the feeding path duration. Protect the critical path from delays on non-critical paths.
Resource Buffers. Not time buffers -- they are early warnings. Placed before critical path activities that require a specific resource. The warning tells the resource: "You will be needed on this activity in X days. Be ready."
BUFFER PLACEMENT EXAMPLE
Non-critical path: [Activity B] [Activity D] [FEEDING BUFFER] ──┐
↓
Critical path: [Activity A] [Activity C] [Activity E] [Activity F] [PROJECT BUFFER] → End
For detailed templates, frameworks, and field-level guidance, read:
references/planning-reference.md — Complete framework details, templates, and examplesRead this file when the task requires: