From ai-adoption-playbook
Builds 90-day phased AI adoption plans with owners, milestones, metrics, and board-aligned timelines. Use after diagnosing blockers and selecting first use case.
npx claudepluginhub adimango/ai-adoption-playbookThis skill uses the workspace's default tool permissions.
Builds a phased AI adoption rollout plan with named owners, concrete milestones, and metrics — aligned to the founder's next board meeting. Takes the fluency scorecard, blocker report, and first use case as inputs. Produces a plan the founder can execute and report on.
Orchestrates full AI adoption sequence for founders: fluency assessment, blocker diagnosis, use case selection, 90-day plan, board narrative.
Guides organizational AI adoption using Brian Balfour's CODER framework: diagnoses barriers, creates plans with constraints, ownership, directives, expectations, rewards.
Translates strategic recommendations into executable plans through option development and scoring, business case construction, roadmap design, and detailed implementation with workstreams and governance.
Share bugs, ideas, or general feedback.
Builds a phased AI adoption rollout plan with named owners, concrete milestones, and metrics — aligned to the founder's next board meeting. Takes the fluency scorecard, blocker report, and first use case as inputs. Produces a plan the founder can execute and report on.
Core principle: A plan without named owners and dates is a wish list. Every action in this plan has a who and a when.
digraph plan {
"Review prior artifacts" [shape=box];
"Discovery questions (4-6 Qs)" [shape=box];
"Build Phase 1: Pilot (Days 1-30)" [shape=box];
"Build Phase 2: Expand (Days 31-60)" [shape=box];
"Build Phase 3: Prove (Days 61-90)" [shape=box];
"Founder reviews each phase" [shape=diamond];
"Adjust" [shape=box];
"Produce final plan" [shape=box];
"Route to next skill" [shape=doublecircle];
"Review prior artifacts" -> "Discovery questions (4-6 Qs)";
"Discovery questions (4-6 Qs)" -> "Build Phase 1: Pilot (Days 1-30)";
"Build Phase 1: Pilot (Days 1-30)" -> "Founder reviews each phase";
"Founder reviews each phase" -> "Adjust" [label="change needed"];
"Founder reviews each phase" -> "Build Phase 2: Expand (Days 31-60)" [label="approved"];
"Adjust" -> "Founder reviews each phase";
"Build Phase 2: Expand (Days 31-60)" -> "Founder reviews each phase";
"Founder reviews each phase" -> "Build Phase 3: Prove (Days 61-90)" [label="approved"];
"Build Phase 3: Prove (Days 61-90)" -> "Produce final plan";
"Produce final plan" -> "Route to next skill";
}
Reference the fluency scorecard, blocker report, and use case brief. Summarize what you're building from:
"Here's what I'm working with from your previous sessions: [scorecard summary], [top blockers], [chosen use case]. I need a few more details to build a plan that actually fits your team."
If prior artifacts are missing, ask the founder to summarize their scores, blockers, and chosen use case before proceeding.
You need specifics that the previous skills didn't cover. Ask one at a time:
Skip questions already answered by prior artifacts. Adapt to what you know.
Don't build a plan that asks people to remember to use AI tools. Build a plan that changes the starting conditions of their work so AI is already there.
Examples:
If Phase 1 actions rely on people voluntarily changing habits, the plan will fail. Change the environment, not the people.
Present Phase 1 to the founder. This phase must:
Phase 1 structure:
| Week | Action | Owner | Done when |
|---|---|---|---|
| 1 | [Specific action] | [Named role] | [Concrete deliverable] |
| ... | ... | ... | ... |
Present this to the founder: "Here's what Month 1 looks like. Does this feel right, or should we adjust?"
Phase 2 must:
Phase 3 must:
After founder approves all three phases, produce the complete plan in the Output format below.
Symptom: Actions say "the team should..." or "someone needs to..." Consequence: Nobody does it. Same ownership gap that caused the problem. Fix: Every action has a specific role or person. "The adoption champion configures..." not "the tool should be configured..."
Symptom: You re-run the fluency assessment or re-analyze blockers inside the plan. Consequence: Wasted time, contradictory findings, founder fatigue. Fix: Reference prior artifacts directly. "Your blocker report identified X. Phase 1 addresses this by..."
Symptom: Each phase has 15+ action items, risk registers, contingency tables. Consequence: Founder looks at it and does nothing. Too many items = no priorities. Fix: 4-6 actions per phase maximum. If it's more than that, you're over-planning. The founder needs to know what to do this week, not every possible thing that could happen.
Symptom: "Expand adoption" or "improve team sentiment" as a milestone. Consequence: No way to know if you hit it. Board can't evaluate progress. Fix: Every milestone has a number. "5 engineers using AI tools weekly" not "increase adoption."
Symptom: Every action is "train," "encourage," or "remind" people to use AI tools. Consequence: Adoption depends on willpower. People revert to old habits within weeks. Fix: At least one action per phase must change the default — make AI the starting point for a task, not an optional step people have to remember.
Symptom: The plan avoids the main blocker (e.g., the hostile VP) and works around them. Consequence: Short-term progress, long-term failure. The blocker is still there. Fix: Phase 1 must include a specific action to address the #1 blocker. You can be strategic about it (build proof first, then confront) but you can't ignore it.
Produce the 90-day plan in this exact format:
## 90-Day AI Adoption Plan
**Company:** [name] | **Team:** [size] | **Stage:** [stage] | **Date:** [date]
**Board meeting:** [date or "Day X"]
**Adoption champion:** [name/role] | **Time allocation:** [hours/week]
**First use case:** [name from use case brief]
### Starting Position
- Fluency scores: Psych [X/5] | Integration [X/5] | Ownership [X/5]
- Top blocker: [from blocker report]
- Current state: [one sentence — e.g., "3 of 25 engineers use AI tools occasionally"]
### Phase 1: Pilot (Days 1-30)
**Goal:** [One sentence]
| Week | Action | Owner | Done when |
|------|--------|-------|-----------|
| 1 | ... | ... | ... |
**Phase 1 success metric:** [Specific, measurable]
### Phase 2: Expand (Days 31-60)
**Goal:** [One sentence]
| Week | Action | Owner | Done when |
|------|--------|-------|-----------|
| 5 | ... | ... | ... |
**Phase 2 success metric:** [Specific, measurable]
### Phase 3: Prove & Present (Days 61-90)
**Goal:** [One sentence]
| Week | Action | Owner | Done when |
|------|--------|-------|-----------|
| 9 | ... | ... | ... |
**Phase 3 success metric:** [Specific, measurable]
### Board-Ready Numbers (Target for Day 90)
| Metric | Baseline | Target |
|--------|----------|--------|
| Engineers using AI tools weekly | [X] | [Y] |
| [Use-case-specific metric] | [X] | [Y] |
| Estimated hours saved per week | [X] | [Y] |
| Tool cost per month | [$X] | [$Y] |
### What You'll Say to the Board
[3-4 sentence draft narrative the founder can adapt. Specific numbers, not platitudes.]
| Situation | Recommended next skill |
|---|---|
| Founder wants to rehearse for the board | board-narrative-coach |
| Founder wants to calculate ROI now | roi-calculator |
| Founder wants the full adoption cycle | Continue to board-narrative-coach (next in the chain) |
| Default | board-narrative-coach |
fluency-assessment — provides the scorecard that frames the starting positionblocker-diagnosis — identifies what Phase 1 must addressfirst-use-case-picker — defines the use case the plan is built aroundboard-narrative-coach — most common next step, rehearses and drafts the board updatefull-adoption-cycle — orchestrates this skill as the fourth step in the complete sequence