From antigravity-awesome-skills
Guides Odoo Manufacturing configuration: Bills of Materials, Work Centers, routings, MRP planning, and production order workflows.
npx claudepluginhub absjaded/antigravity-awesome-skillsThis skill uses the workspace's default tool permissions.
This skill helps you configure and optimize Odoo Manufacturing (MRP). It covers Bills of Materials (BoM), Work Centers, routing operations, production order lifecycle, and Material Requirements Planning (MRP) runs to ensure you never run short of materials.
Verifies tests pass on completed feature branch, presents options to merge locally, create GitHub PR, keep as-is or discard; executes choice and cleans up worktree.
Guides root cause investigation for bugs, test failures, unexpected behavior, performance issues, and build failures before proposing fixes.
Writes implementation plans from specs for multi-step tasks, mapping files and breaking into TDD bite-sized steps before coding.
This skill helps you configure and optimize Odoo Manufacturing (MRP). It covers Bills of Materials (BoM), Work Centers, routing operations, production order lifecycle, and Material Requirements Planning (MRP) runs to ensure you never run short of materials.
@odoo-manufacturing-advisor and describe your manufacturing scenario.Menu: Manufacturing → Products → Bills of Materials → New
Product: Finished Widget v2
BoM Type: Manufacture This Product
Quantity: 1 (produce 1 unit per BoM)
Components Tab:
- Raw Plastic Sheet | Qty: 0.5 | Unit: kg
- Steel Bolt M6 | Qty: 4 | Unit: Units
- Rubber Gasket | Qty: 1 | Unit: Units
Operations Tab (requires "Work Orders" enabled in MFG Settings):
- Operation: Injection Molding | Work Center: Press A | Duration: 30 min
- Operation: Assembly | Work Center: Line 1 | Duration: 15 min
BoM Types explained:
- Manufacture This Product — standard production BoM, creates a Manufacturing Order
- Kit — sold as a bundle; components are delivered separately (no MO created)
- Subcontracting — components are sent to a subcontractor who returns the finished product
Menu: Manufacturing → Configuration → Work Centers → New
Work Center: CNC Machine 1
Working Hours: Standard 40h/week
Time Efficiency: 85% (machine downtime factored in; 85% = 34 effective hrs/week)
Capacity: 2 (can run 2 production operations simultaneously)
OEE Target: 90% (Overall Equipment Effectiveness KPI target)
Costs per Hour: $75.00 (used for manufacturing cost reporting)
The MRP scheduler runs automatically via a daily cron job.
To trigger it manually:
Menu: Inventory → Operations → Replenishment → Run Scheduler
(or Manufacturing → Planning → Replenishment in some versions)
After running, review procurement exceptions:
Menu: Inventory → Operations → Replenishment
Message Types:
"Replenish" — Stock is below minimum; needs a PO or MO
"Reschedule" — An order's scheduled date conflicts with demand